|
mfoegs/studio RESUME MICHAEL J FOEGELLE
2060 Forest Aveune Suite 250 mfoegelle@mfoegs.com
San Jose, CA. 95128-4834
T 408 287 7783
FX 408 516 8988
C 510 703 3745
CERTIFICATION State of California, Licensed Architect C-22320
EDUCATION B. of Arch, cum laude, California Polytechnic
State University, San Luis Obispo, CA., 1983
International Marketing, UCLA, Los Angeles, CA.
EXPERIENCE
- 1996 – Present Principal mfoegs/studio Architecture+Management, San Jose, CA.
PROJECT MANAGEMENT/DESIGN: Principal management/design architect representing San Jose State University in the interior/exterior remodel of 15,000 sq ft installation of Industrial Studies Laboratory Space in existing Type 1 structure on Downtown San Jose campus San Jose, CA.
Construction cost: $2 million
CONSULTING CONSTRUCTION ADMINISTRATION: Representing HMC Architects in the new construction of two story, eleven classroom elementary school building on existing Anne Darling campus in San Jose, CA. Construction cost: $6 million.
CONSULTING PROJECT MANAGEMENT: Representing HMC Architects in the new construction of Locker/Shower/PE office building on existing Britton Middle School campus in Morgan Hill, CA.
Construction cost: $4 million.
PROJECT MANAGEMENT/DESIGN: Principal management/design architect representing SkyBox Lounge in the interior remodel of 10,000 sq ft, sports bar/lounge upgrade to the 2nd floor of an existing unreinforced masonry structure in Emeryville, CA.
Construction cost: $3 million
CONSULTING PROJECT MANAGEMENT: Representing Bill Gould Design in a highly accelerated conversion of an existing middle school to an elementary school at Allen at Steinbeck in San Jose, CA. This fastrack project is regarded as the benchmark for school conversion in the state of California.
Construction cost: $5 million
CONSULTING CONSTRUCTION ADMINISTRATION: Representing Bill Gould Design during the construction of $25 million, campus wide new construction and remodel to Capuchino High School in San Mateo, CA.
Construction cost: $25 million
PROJECT ARCHITECT/DESIGN: Principal Design Architect representing Bay Area Luxury Homes in the development of (4), 4000 ft. single family dwellings on contiguous sloping sites in Redwood City, CA.
Construction cost: $1.5 million
PROJECT ARCHITECT/DESIGN: Principal design architect representing Ellis Alden in the development of “Alden Fountain.” A monument/water feature congregating elements of a management/welleness retreat tucked into the hills above Anderson Valley near Healdsburg, California.
Construction cost: $2 million
CONSULTING PROJECT MANAGEMENT: Representing Woodside Hotels & Resorts in preconstruction planning, scheduling and budgetary coordination for 80,000 sq.ft. mixed use development on Cannery Row, Monterey, CA.
Construction cost:$12 million
CONSULTING PROJECT ARCHITECT: Representing Kwan Henmi Architecture Planning, Inc. of the Moscone Joint Venture Team (Gensler, Michael Willis, KHA) during the General Construction Contract Document Production Phase of a 750,000 sq.ft. Convention Center, San Francisco, CA., City of San Francisco
Construction cost: $190 million
CONSTRUCTION PROJECT MANAGEMENT:On site representative for Fremont Unified School District during construction phase of, 150,000 sq. ft. bond funded reconstruction and renovation of Washington High School, Fremont, CA.
Construction cost $15 million
- 1994 - 1996 BCA, Inc., Architects and Engineers, Fremont, CA
PROJECT MANAGER: Promoted to Studio Director within one year to oversee studio operations and staffing for all programming, design and production in CAD literate office.
$15 million, 150,000 sq. ft. reconstruction and renovation of Washington High School, Fremont, CA., Fremont Unified School District. $5 million, 80,000 sq. ft. Ranch Market & retail shopping center, Fremont. CA., Pau Properties. $1 million, 34,000 sq. ft raceway grandstand renovation, Altamont, CA., Ultimate Peak, Inc. $3 million, 50,000 sq. ft. new multi- family residences and townhouses, Fremont, CA., Mission Development. $1.5 million 20,000 sq. ft. multi-site interior improvements for business telecommunications centers, Oakland, CA.,
Fremont, CA., MFS Technologies, Inc. $.5 million, 3000 sq. ft. new interior improvement for contemporary Italian restaurant, San Mateo, CA., Pasta Primavera, Inc.
CONSTRUCTION ADMINISTRATION: $3 million 25,000 sq. ft. new construction of Jensen Ranch Elementary School, Castro Valley, CA., Castro Valley Unified School District, Shapell Industries of Northern California. $4 million 25,000 sq. ft. new construction of Centerville Junior High School multi-purpose auditorium, Fremont, CA., Fremont Unified School District.
- 1992- 1994 mfoegs/studio/art, Los Angeles, CA./Buena Vista, Mexico
CONTEMPORARY FINE ARTIST: Produced 20 piece mixed media on paper T(e)XTW(o)RK series for solo exhibition at 2 Part Gallery, Los Angeles, CA. Produced 30 piece, mixed media on canvas Baja Landscape series for solo exhibit at University of San Francisco, San Francisco, CA.
- 1988 - 1992 - Principal MJF Design Capistrano Beach, CA.
CONSULTING PROJECT ARCHITECT:Principal Architect consulting to Porter Jensen Hansen Manzigol (PJHM), Inc., $2.1 million, 45,000 sq. ft. new construction of Tuscany Hills Elementary school, Lake Elsinore, CA., Lake Elsinore Unified School District. $3 million, 45,000 sq. ft. new construction of Luisiano Elementary School, Lake Elsinore, CA., Lake Elsinore Unified School District. $6 million, 60,000 sq. ft new construction of Capistrano Junior High School, Mission Viejo, CA., Capistrano Valley UFD.
PROJECT ARCHITECT/DESIGN: $.35 million, 3000 sq. ft. 3 bedroom, 3 bath new construction of contemporary Mediterranean style dwelling and $.5 million, 4500 sq. ft. 4 bedroom, 3 bath California Beach style dwelling on adjacent hillside sites, San Clemente, CA., Latitude West Development.
- 1987 - 1988 Martin Gantman Studio, Santa Monica, CA.
SENIOR DESIGNER: $.25 million, 2,000 sq. ft. residential addition, Pacific Palisades, CA. The Hydes. $.25 million, 3000 sq. ft. new interior retail tenant improvement, Hollywood, CA. Roppongi Shoes. $100,000 retail storefront improvement, Hollywood, CA., Drakes.
- 1985 - 1987 Cole/Martinez/Curtis, Marina Del Rey, CA.
JOB CAPTAIN: $5 million 80,000 sq. ft. new interior commercial tenant improvements, Burbank, CA., Disney Channel. $3.5 million, 50,000 sq. ft. new interior commercial tenant improvements, Los Angeles, CA., Coast Savings Corporate Headquarters. $.5 million 15,000 sq. ft. new interior retail tenant improvements, Los Angeles, CA., Museum of Contemporary Art Bookstore. $3 million 200,000 sq. ft. new interior commercial tenant improvements, Woodland Hills, CA., 20th Century Insurance. $20 million, 500,000 sq. ft. new hospitality interior remodel, Las Vegas, NV., Desert Inn. $1 million, 20,000 sq. ft. new commercial interior tenant improvements. Los Angeles, CA., Olup & Jennings Advertising.
- 1984 - 1985 Mattel Toys, Inc. El Segundo, CA.
SUPERVISOR, FACILITIES DESIGN: Coordinated inter-company movements and produced space Improvement packages for 20 departments and staff of 350 in 1 million sq. ft corporate office headquarters. Prime contact in integrating non-company construction teams with in-house facilities, telecom and data system operations.
1983 - 1984 Hellmuth, Obata, Kassabaum, Los Angeles, CA.
JUNIOR DESIGNER: $18 million, 180,000 sq. ft. office tower, Glendale, CA., Jaymont Properties. $25 million 500,000-sq. ft. retail shopping center, Los Angeles, CA. Olympia & York Development.
AWARDS
Award for Design Excellence, Coalition for Adequate School Housing, "Washington High School Reconstruction" (1999). Award of Merit, Real Projects, "Venice Pavilion" (1991) 1st prize, Knoll Design Board Competition (1987). Honorable Mention, Paul Masson Winery Gardens Competition (1980).
APPLICATIONS
ACAD 2002 Architectural Desktop, MS-Word, Excel, Projects 2020, Dreamweaver 4, Fireworks 4, MS Publisher, MS Powerpoint
|
|